TR30 CLC Foaming Machine Concrete Foam Generator

As the world deals with potential supply shortages, oil prices are soaring again, with more dramatic spikes and sudden drops expected.

For consumers, that means more expensive gas for longer - prices at the pump remain above $4 a gallon. For the economy, that means more inflation. In addition to the pressure on consumers, any business that relies on oil -- from airlines and truck drivers to chemical companies and plastics producers -- will face higher costs.

Mr Pickering estimates that 2m to 3m barrels a day of Russian oil shipped by water are frozen out of the market with no direct buyers. Due to the soaring oil price, the price of the Concrete Foaming Generator in the chemical industry will also be greatly affected. He said China and India are continuing to buy Russian crude. "I'm sure there will be others willing to take on more over time," he said. Mr Pickering said he did not expect oil to return to $130 a barrel, but added that it could happen. Francisco Branch, head of commodities and derivatives at Bank of America, said the US market was ready for cyclical price spikes and price swings in the Concrete Foaming Generator.

Description of TR30 foam generator

Foam Concrete Machine is the core equipment of foam concrete production, which has a significant impact on the quality of foam concrete. An excellent foam generator for concrete not only has a high foam output but more importantly, the quality of the foam produced is outstanding. TR30 foam generator developed by our company. It can be used in laboratories, small-scale foam concrete cast-in-situ projects, and pilot lines of foam concrete products. The outstanding advantages of TR30 foam generator are low foam moisture content, more foaming agent, high foam uniformity, large foam output, and other benefits.


Parameters of TR30 foam generator

Model

TR30

Maximum foam outputm3/h)

8

Motor voltage(V)

220

Work rate(W)

1500

Pump suction(m)

1-3

Dimensions(cm)

120*50*90

Weight(kg)

120


Usually need to be disassembled:

1. After working for a long time, it is found that the foam shape is not good, usually more than three months.

2. Pipe blockage: Some foaming agent remaining in the bubble tube will form a solid residue. In this case, the foam cannot be produced normally, or the pipeline pressure increases sharply. At this time, all the old steel balls need to be taken out, and then replaced with a new one The ball is fine. Steel wire ball specification requirements: each blowing tube needs to be filled with about 12-15 steel wire balls. Too much or too little will affect or even destroy the foam performance. 


Precautions:

1. Remember to use electricity safely. If water or foam touches the circuit, you must immediately cut off the power at the remote end to ensure safe production.

2. There will be air in the pipeline when it is used for the first time. The foaming liquid has not been pumped into the equipment in a short time. You can wait for tens of seconds until the liquid is filled with the entire suction tube and the foaming operation can be performed normally.

3. Do not start the equipment when the pipeline is blocked to prevent damage to the components due to overpressure in the pipeline.


If you are looking for foam generator please feel free to contact us and send an inquiry, email address: sales@cabr-concrete.com


Model: TR30
Maximum foam output(m3/h): 7.5
Motor voltage(V) : 220
Work rate(KW): 3
Foaming speed(L/m): 120
Bubble bleeding(kg/m3): 46
Dimensions(cm): 120*50*90
Weight(kg): 120

Because of the conflict between Russia and Ukraine, there is a shortage of natural gas supply. At the same time, other renewable energy sources cannot produce enough electricity, so electricity prices have soared in many countries of the world. For this reason, I assume the supply and prices of the Concrete Foaming Generator would keep being influenced by the high energy prices.

Inquiry us

Our Latest Products

Metal Alloy High Purity Tungsten Crucibles

About Metal Alloy High Purity Tungsten Crucibles:Chemical composition:…

Metal Alloy Vacuum Coating Tungsten Melting Pot Tungsten Crucibles

About Metal Alloy Vacuum Coating Tungsten Melting Pot Tungsten Crucibles:Chemical composition:…

Metal Alloy Fine Surface 19.15g/cm3 Tungsten Targets

About Metal Alloy Fine Surface 19.15g/cm3 Tungsten Targets:Chemical composition:…

0086-0379-64280201 brad@ihpa.net skype whatsapp